wesito2005pafzvc
wesito2005pafzvc wesito2005pafzvc
  • 17-06-2018
  • Mathematics
contestada

If 7 workers took 48 days to complete a project in how many days would 12 workers complete the same project

Respuesta :

AL2006
AL2006 AL2006
  • 17-06-2018
7 workers take 48 days to do one full job.

Together, they do (1/48) of the job per day.

Each worker does (1/7) of (1/(48) = 1/(48·7) of the job per day.

12 workers would do (12 / (48·7) = 1/(4·7) = 1/28 of a job per day.

So it would take them 28 days to do one whole job. 
Answer Link

Otras preguntas

Read the following text and summarize in a sequencing format text structure: How long does it take to train a dog? When the dog is about eight weeks old, it’s p
3 1/2 divided by 1/8 ( show your work ! )
Explain where the water that collects on the outside of a cold drink on a hot day comes from.
anyone know the answer to all of these if u dont answer the ones u know ​
PLEASE HELP HURRY!!Which description best defines what revisiting is when paraphrasing?A. setting the source aside so that you can form an opinion about the inf
which of the following is not an advantage of a group test
The Kepler space telescope was launched on March 7, 2009. What is an effect of this occurrence?. ​
Analyze the graphic organizer below and answer the question that follows. How does a tyrant seize total power? A tyrant seizes power by bullying the common peop
Good Afternoon Everyone !!! I have a couple quick questions that I need you all l to answer asap - Explain what is mercantilism - Analyze how the Navigation
f(-1)3x + 5 if x < 0 2x + 6 if x 20​