deysifajardo2316 deysifajardo2316
  • 18-08-2018
  • Mathematics
contestada

Dan can tile a floor in 3 hours. his assistant could tile the same floor in 8 hours. if they work together, how long will it take to tile the floor?

Respuesta :

wolf1728
wolf1728 wolf1728
  • 18-08-2018

There is a formula for this:

Total Time = (worker1 * worker2) / (worker1 + worker2)

(3 * 8) / (3 + 8)

24 / 11 =

2.1818181818 hours


Answer Link

Otras preguntas

is the point (x,y)(300m,800m)(x,y)(300m,800m) a point of maximum constructive interference, perfect destructive interference, or something in between?
Which of the following is equal to the square root of the cube root of 6? (4 points) A. 6 to the power of one sixth B. 6 to the power of one third C. 6 to the p
all of the following statements about local governments are true except: a. local governments help implement state programs. b. local governments disburse funds
what 2 factors determine the strength of the gravitational pull between 2 objects?
Answer to this required:
a shipping company claims that 95% of packages are delivered on time. a student wants to conduct a simulation to estimate the number of packages that would need
sce co. is offering 2,100 shares of stock in a dutch auction. the bids include: 1,400 shares at $32 per share, 1,500 shares at $31 per share, 1,400 shares at $3
draw a line along this convergence. what weather events typically occur along the line that you drew?
which insect shorted out an early supercomputer and inspired the term computer bug?
Ethanol is manufactured by two different process... for each process, name the organic reactant and state the type reaction​