A bar graph that shows what projects or tasks are in process and how much of each is completed is called a(n):
a. Gantt chart.
b. Stem chart.
c. Grid chart.
d. Priority chart.

Respuesta :

metchelle
metchelle metchelle
  • 01-07-2016
The correct answer is option A. Gantt chart. A bar graph that shows what projects or tasks are in process and how much of each is completed is called a Gantt chart. A Gantt chart is a horizontal bar graph that shows the number of work done or completed production in a certain period of time. This production tool is developed by Henry L. Gantt, an American engineer, in 1917.
Answer Link

Otras preguntas

Anybody have any idea on how to do this?
Raj paints 10 3/7 feet of his fence on Friday and 15 1/3 feet of his fence on Saturday. How many feet of his fence did Raj paint on both days?
Genes can be best described as
Which statement accurately describes a way in which the jobs of environmental scientists and chemists compare? A) Chemists study the structure and composition o
i need the steps for 26
PLEASE HELPPP MY WORD Explain three of the five theories of forgetting. Which of these three theories do you find most compelling. Why?
The circumstance of a 10in circle
Which ordered pair is a solution of the equation? -7x+3y=2
Which is a correct first step in solving 5 – 2x < 8x – 3 nd a bold line starts at 0.5 and is pointing to the right. A number line from negative 1.5 to 1.5 i
Find the value for each expression where a = 3 and b = 5. Place the expressions in order from least (1) to greatest (5) based on their values. 2a + b2b + a3(a +