breannaisbae
breannaisbae breannaisbae
  • 17-11-2016
  • Mathematics
contestada

A contractors crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

snowmaneasy1
snowmaneasy1 snowmaneasy1
  • 17-11-2016
54 divide by 3 then you get 18weeks
Answer Link

Otras preguntas

Which factor contributed to a dramatic increase in crime in the u.s. in the 1960s and 1970s?
what is the distance between 3/4 and 7/8
Name three pairs of numbers that have 5 as the greatest common factor
What environmental variable has the closest direct relationship with population growth?
what country arrives the mountain range of the Andes? to. Venezuela c. Bolivia b. Chile d. Mexico
A person who expresses the cultural characteristic of both males and females is
6 less than 7 divided by x
The Met was founded in 1870 by a group of _____.
What happens to the altitude of Polaris As you move Due West from Mamaroneck to Chicago?
It's the end of the accounting period and no electric bill has been received (but expense has been incurred. ; you should record and entry that