rushu
rushu rushu
  • 19-07-2021
  • Mathematics
contestada

ram can do a piece of work in 8 days. He work fir 6 days and left. If hari finish as the remaining work . how much work is done by hari?​

Respuesta :

danielmaustin51
danielmaustin51 danielmaustin51
  • 25-07-2021

Answer:

Hari finished the last two days of work that ram had left behind so that means that hari did 2 days of work.

Answer Link

Otras preguntas

5/4+x/2 =3 Hey can someone explain this please!
where did world war one start
what is the value of x in 36/45 = x/5​
20. Which of the following best describes the best flow of energy in living things? a. Chemical Cellular-Radiant b. Radiant->Chemical Cellular c. Cellular-Ra
Jennifer has 36 DVDs. This number of DVDs is 80% more than the number she had last month. How many DVDs did Jennifer have last month?
where are my smart people at help please
Order these numbers from least to greatest 2.56 , 2,3061 , 2.507 , 206
a) √ 80/405 b) √ 256/196 c) √ 288/128
What led to a significant increase in the number of factory jobs available to African American workers during World War I? Select the two correct answers. A. th
(EZ 25 POINTS) What is the measure of the smallest angle in the figure? The figure is not drawn to scale?