mwakatebeasifiwe
mwakatebeasifiwe mwakatebeasifiwe
  • 16-10-2021
  • Physics
contestada

A steel bridge is built in several segment each 20m long , the gap between segment is 4m at 18°c .what is maximum temperature that the bridge can manage buckling​

Respuesta :

talandaher talandaher
  • 16-10-2021

Answer: The answer is The maximum temperature is 172°C

Explanation:

Answer Link

Otras preguntas

Which is not a product of photosynthesis
Four friends went to the fair. Each paid $6.50 to enter and all went to x rides, paying $1.25 per person for each ride. Which expression shows how much money th
Alguém?? Complete the sentences with the past simple: be – get up – meet – have – go – run – drink – sleep – swim – eat 1. I ____ a shower and some fruit for br
Solutions to -3y=2x-7
Patrick Henry was from which state? A.Virginia B.Massachusets C.Washington D.Georgia
What is the mean, median, and interquartile range of 17,23,8,5,16,22,11,13,15,17,18
A clause that may modify a verb Is a(n) _____. noun subordinate adverb
A home mortgage is usually borrowed for how long? A. 10–15 years B. 5–10 years C. 20–30 years D. 15–25 years
Write a balanced half-reaction for the reduction of gaseous nitrogen (N2) to aqueous hydrazine (N2H4) in basic aqueous solution.
Romeo and Juliet I need help please