_____ are budgets for a single activity level. Chọn một: a. Flexible budgets b. Master budgets c. Static budgets d. Both b and c are correct

Respuesta :

user34329842328
user34329842328 user34329842328
  • 16-10-2021

Answer:

c. Static budgets

Explanation:

Answer Link

Otras preguntas

The figure below is a net for a triangular prism. Side a = 46inches, side b = 12 inches, side c = 32inches, and altitude d = 22inches. What is the surface area
Square ABCD has a diagonal AC with the given vertices. Find the coordinates of the remaining vertices. A(-3, 2) and C(0, 5) The coordinates are (_,_) and (-3,_)
Cancerous cells sometimes have odd numbers of chromosomes. What checkpoint did those cells bypass/ignore? a. None of the above b. The G1 Checkpoint c. The G2 Ch
which of the following technological examples is best used to compare the effects of local-scale and global-scale political challenges to state sovereignty?
Estimate the amount of the tip by rounding the bill to the nearest ten dollars before calculating. 20% tip on a bill of $542.11 The amount of the tip is approxi
Order these ideas chronologically as they appear in the speech. “Remarks of the Senate”
In "Space Junk!," how does the author emphasize the negative impact of the space junk? The author advises readers to take steps to reduce space junk. The author
true or false: a vertical shift is an example of a non-rigid transformation.
how do I balance this?
f(x)=-x^2-4x+5 find the vertex, zeros, and y-int.