inagreen2020 inagreen2020
  • 18-11-2021
  • Physics
contestada

A crane lifts a 10000 N load through a distance of 30mins in 40s calculate work done

Respuesta :

blackshades
blackshades blackshades
  • 18-11-2021

Given,

Force = 10,000 N

Distance = 30 m

Time = 40 s

Work done = force × distance

Work = 10,000 × 30

Work = 300,000 J

______

꧁✿ ᴿᴬᴵᴺᴮᴼᵂˢᴬᴸᵀ2222 ✬꧂

Answer Link

Otras preguntas

how do u say "it is spring" in spanish
If it costs 82.50 to rent a kayak for 3 hours, how much does it cost to rent a kayak for 1 hour
Is 9/12. Bigger than 3/4?
20 is what percent of 52
If y ¤ x = y2x for all positive integers, then (3 ¤ 4) ¤ 2 =
What is the total displacement of a bee that flies 2 meters east, 5 meters north, and 3 meters east?
how do you know how to write 1/2 in percent?
Under certain conditions, sound travels at approximately 1080 feet per second. If Marsala yells down a canyon and hears her echo 1.7 seconds later, approximatel
how do you know how to write 1/2 in percent?
The height (in meters) of a projectile shot vertically upward from a point 2m above ground level with an initial velocity of 24.5m/s is h=2+24.5t-4.9t^2 after t