mikee1797 mikee1797
  • 19-07-2022
  • Mathematics
contestada

30men can do a piece of work in 40 days how long will it take to complete the work by 25 men

Respuesta :

hassanpaul24
hassanpaul24 hassanpaul24
  • 19-07-2022

Step-by-step explanation:

men × days=men1×days1

30×40=40×x

x=30days

Answer Link

Otras preguntas

How is this case like the Hazeleood v. Kuhmeir casr?
After arresting a non-US citizen, you must notify the consulate within how many hours?
si 3 personas limpian 144 m cuadrados en 18 minutos,cual es el area aproximada que limpiaran 5 personas en 8 minutos​
In what year did the moose start to die A. 1920 B. 1930 C. 1933 D. 1950
Which of the following would help an organism to better maintain its buoyancy in the water column? Check all that apply. a) Swim bladder b) Oil-filled sacs c) B
According to ASME, What percentage of the manufacturer's crane rating must not be exceeded if a load test is done on a repaired crane?
The income capitalization approach to appraising value is most applicable for which property type? a) Single-family residences b) Retail properties c) Industria
What are the priority assessment findings for Gastrointestinal Structural and Inflammatory Disorders?
A retrospective review is an evaluation of health care services to determine medical necessity and appropriateness of the care provided during the time services
What is postformal operational thought in which knowledge depends on context and the subjective perspective of the knower?a) Concrete operational thoughtb) Form