manysavage19 manysavage19
  • 17-05-2017
  • Mathematics
contestada

A construction company can remove 412 metric tons of dirt from a construction site in 338 hours. What is the unit rate in metric tons per hour? Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

elizaml1024
elizaml1024 elizaml1024
  • 17-05-2017
.82 because 338/412=.82
Answer Link
Аноним Аноним
  • 17-05-2017
338/412=.82
Hope that helps
Answer Link

Otras preguntas

give an example of a model used in science that is larger than the real object and an example of model that is smaller than the real object
if f(x) = x2 – 2x and g(x) = 6x 4, for which value of x does (f g)(x) = 0?
hernando cortes's army crushed which civilization?
What is the solution to n/4 = -12.4? n = n = 3.1 n = -3.1 n = 49.6 n = -49.6
what is 9x +677 =5x-9
give two words that rhyme with thrown
if veronica reed is paid a gross weekly salary of $1036.00, what is her gross annual salary?
Which is NOT an undefined term in geometry
What was the greatest challenge cities faced as a result of rapid industrialization in the 1800s? attracting skilled laborers to work in new and developing fact
5y-y^3=12 in verbal sentence